• Book an appointment

  • The best day and time for me is usually

Grenfell: What are we learning?


Dame Judith Hackitt has been tasked with investigating the tragic events of Grenfell.
Whilst we await final publications, by sitting on various committees I get to hear the latest news and how this is all developing, so it's worth sharing some of this with you as to how industry experts are thinking. 

Better communication amongst industry sectors (such as architects, building control, construction, fire protection installers and risk assessors) is of paramount importance- ‘the golden threat’. Working groups have now been set up and this is a great starting point.

The Construction industry will be heavily scrutinized. Approved inspectors- independent of builders must only be used. ‘The race to the bottom’ mentality needs to change. Redrafting Approved Document B (building regulations). Buildings must be passed off with exacting certification and documentation right from the outset and prior to occupation of new and significantly refurbished buildings.

Introducing a foundation course in the basics of fire safety to contractors and even duty holders seems a likely step to take.

Most importantly, 3rd party accreditation a must! For fire risk assessors, there maybe a tiered system whereby assessing high risk residential (buildings over 18 metres)/ care homes, assessors will need to be qualified to the highest level.

Non combustible materials mandatory in high rise buildings.
Scotland seem intent on ensuring public buildings north of the border are as safe as they possibly can be with mandatory levels of detection and sound alert systems along with sprinklers installed.

More information by Dame Judith Hackitt and her report, 'Building a Safer Future', is easily found online. Dame Judith created six working groups to reflect six areas identified in her earlier, interim, report.

  1. The design, construction and refurbishment group is establishing what industry and regulators need to do to make sure building safety is embedded during the design and construction phase.
  2. The occupation and maintenance group is recommending how building owners, landlords and regulators can ensure that a building is always safe throughout its life cycle.
  3. The products group is determining how product testing and marketing can be improved.
  4. The competency group is establishing how competency should be assessed for people involved in building and managing complex and high risk buildings.
  5. The residents' voice group is looking at how residents can be given a clear, quick and effective statutory route for raising concerns on fire safety.
  6. The regulation and guidance group is assessing whether central government should be in charge of technical guidance for complex and high risk buildings

  • Date posted:
    19/12/2018
  • Share:

View all articles


  • Grenfell: What are we learning?

    Dame Judith Hackitt has been tasked with investigating the tragic events of Grenfell.

  • read more

    latest news

Mark and his team can be relied upon to inspect and respond on our properties across London.

Michael Weston
Littlecroft Properties, Essex

Safety at our site in London is imperative and by using HASAW they have on many occasions, designed, produced and delivered the appropriate fire signage to help keep the site safe

Leona Varley
Covent Garden Market Authority, London

The whole town turns out for our event and we spend a huge amount of time making it fun for all. We are always grateful to Mark for double checking our procedures helping us to make it safe for everyone.

Lyndsey Burch
Thrapston Charter Fair Committee
  • Book an appointment

  • The best day and time for me is usually

© 2020 Help and Safety at Work | Fire safety, fire risk assessments, fire training

privacy / cookies

website cms powered by csb internet

we don't bite!
08000 838114 / 01832 735874