• Book an appointment

  • The best day and time for me is usually

Care home put residents 'at risk' in fire safety shock


A BOURNEMOUTH care home rocked by a fire scare had been deemed ‘not safe’ during an official inspection months before.
A BOURNEMOUTH care home rocked by a fire scare had been deemed ‘not safe’ during an official inspection months before.

Knyveton Hall, a privately run home with the capacity for 39 elderly people on Knyveton Road, was evacuated on February 16 after an electrical fault sparked a fire in a flat at the back of the buildings which spread to the roof.

Twenty-eight people, many elderly residents, were led to safety amid large plumes of smoke.

A damning report published by the Care Quality Commission last month following an inspection in December has revealed there were already concerns about the home’s fire safety.

The report, which described residents as being put ‘at risk of harm’, said there was no evidence the home had followed good practice with regular fire equipment checks.

It continued: “We found that the fire door to the laundry room had part of the intumescent smoke seal missing which meant that the door would have been less effective in preventing the spread of smoke in the event of a fire.

“We also found that the first floor bathroom door was broken. The bathroom contained an electric bath seat and other combustible items. Again, this door would not have been effective in preventing the spread of smoke in the event of a fire.”


Other health and safety issues were identified, including chemical cleaning substances decanted in water left unsecured in a toilet and laundry room, which inspectors said ‘people living in the home could have easily accessed and been put at risk’.

The home had ignored warnings about ‘unsafe and unsuitable’ premises during a previous inspection, according to the report.

It said: “We saw that there were broken windows in the downstairs toilet and kitchen. The broken window had been identified by an environmental health officer some months previously and the home had been given a notice to repair this.

“This may have posed a risk to staff who accessed these areas.”

The report concluded: “We have taken enforcement action against Knyveton Hall Rest Home to protect the health, safety and welfare of people using this service."

Original Source

Bournemouth Echo

  • Date posted:
    14/05/2015
  • Share:

View all articles



It's particularly helpful that HASAW can complete Fire Risk Assessments, Fire Training and PAT Testing in one visit

Louise McWeeney
Connection Capital, Daventry, Northamptonshire

With our Youth Club, it is of vital importance that our staff are able to carry out an effective evacuation. Our recent training helps us to do this

Daniel Campbell
The Bradfield Club, Peckham, South East London

Thank you for the support you gave us concerning The Fire Risk Assessment, PAT Testing and Signage at our Warehouse in Northamptonshire. Your contribution was a big help and I would not hesitate to recommend your company

Tony Sanders
DSV
  • Book an appointment

  • The best day and time for me is usually

© 2018 Help and Safety at Work | Fire safety, fire risk assessments, fire training

privacy / cookies

website cms powered by csb internet

we don't bite!
08000 838114 / 01832 735874